Permit
Formal authorization to construct, alter, move, or demolish a structure. It confirms the work meets local code and zoning requirements.
Applies to
Most construction, alteration, trade, and demolition work
Project example
A detached garage may need zoning approval for placement, a building permit for the structure, and separate electrical approval if power is added.
Also called
Where this term shows up in permit work and how it affects the project
The permit establishes the approved scope, the drawings and documents the reviewer accepted, and the inspections required before the work can be closed out.
If this term appears in a form, plan comment, or local ordinance, start with the building permit guide, compare it against the zoning permit guide, then use the permit guide directory to find the right local path.
Why permit matters in a permit file
A permit is the project record that connects the proposed scope to the applicable reviews, fees, inspections, and final approval. It does not guarantee that every part of the project is allowed; zoning, health, utility, fire, or public-works approvals may sit beside it.
Where it appears in the permit process
Before construction
The application identifies the property, owner, contractor, project scope, valuation, and work that needs review.
During plan review
The AHJ checks forms, drawings, calculations, product information, and related approvals against its adopted rules.
During construction
The issued permit controls the approved scope and lists the inspections that must happen before work is concealed or completed.
At closeout
A final inspection, final approval, or certificate of occupancy closes the record, depending on the project.
What you may need
- The AHJ's official application or portal submission
- A clear written scope and project valuation
- Site plan, survey, drawings, or product specifications when required
- Owner authorization and contractor license or registration information
- Separate trade or agency approvals triggered by the scope
Where to get it or verify it
- Use the building or permitting department's official website, forms page, or filing portal.
- Confirm the issuing authority for the project address before choosing a form; mailing city and permit authority are not always the same.
- Use Permitech's address check when the local path is split across a city, township, county, or separate review agency.
Common mistakes that create comments or delays
- Starting with the nearest city instead of confirming the actual AHJ
- Treating one building permit as proof that zoning or trade approvals are complete
- Submitting drawings and an application that describe different dimensions or scopes
- Starting work before issuance or missing a required pre-cover inspection
What to do next
- Define the exact work, property address, and person or company performing it.
- Confirm every issuing authority and permit lane triggered by the scope.
- Collect the application, drawings, property documents, and contractor information as one coordinated packet.
- Track issuance, conditions, inspections, and closeout instead of stopping at approval.