Footing / Foundation

Subsurface supports that transfer building loads to the soil.

StructuralFoundationsConstruction types

Applies to

Additions · Garages · Decks · Sheds · New buildings

Project example

A detached garage plan may require a thickened-edge slab, continuous frost footing, or engineered foundation depending on size, soil, climate, and local amendments.

Also called

spread footingslab foundationstem wall

Where this term shows up in permit work and how it affects the project

Foundation design determines excavation depth, reinforcement, anchoring, structural calculations, concrete inspections, and whether work can proceed before approval.

If this term appears in a form, plan comment, or local ordinance, start with the building permit guide, compare it against the zoning permit guide, then use the permit guide directory to find the right local path.

Why it matters for approval

Why footing / foundation matters in a permit file

Footings spread building loads into soil, while the foundation transfers and supports the structure above. Permit documents must show a complete load path suited to local frost, soil, wind, geometry, and use—not merely label a line 'foundation.'

Where it appears in the permit process

  1. Design basis

    The designer establishes loads, soil assumptions, frost depth, bearing, foundation type, drainage, and the relationship to existing construction.

  2. Structural review

    Plans are checked for dimensions, depth, reinforcement, concrete or masonry, connections, anchors, slabs, and special engineering.

  3. Excavation and form inspection

    The AHJ may inspect soil, depth, width, reinforcement, forms, utilities, and setbacks before concrete is placed.

  4. Foundation completion

    Waterproofing, drainage, backfill, anchors, slab preparation, and as-built location may be verified before framing proceeds.

What you may need

  • Foundation plan and dimensioned sections
  • Design loads, frost depth, soil-bearing assumption, and material strengths
  • Reinforcement, anchor, slab, drainage, and waterproofing details
  • Geotechnical report or structural calculations when required
  • Existing-foundation connection details for additions

Where to get it or verify it

  • Use the AHJ's adopted code, climate criteria, local amendments, and standard foundation details.
  • Use a structural engineer or geotechnical professional when spans, loads, soils, slopes, retaining conditions, or existing structures fall outside prescriptive design.
  • Get proprietary anchor, form, and foundation-system documentation from the manufacturer.

Common mistakes that create comments or delays

  • Submitting a floor plan without a matching foundation plan
  • Using a generic detail that conflicts with local frost depth or the actual building
  • Pouring concrete before the required inspection
  • Changing building dimensions or post locations without updating the load path

What to do next

  1. Select a foundation approach that matches the building, site, and local criteria.
  2. Coordinate every wall, post, opening, anchor, and utility penetration.
  3. Obtain required engineering and approval before excavation.
  4. Schedule inspections before concrete, backfill, slab, and concealment.