Footing / Foundation
Subsurface supports that transfer building loads to the soil.
Applies to
Additions · Garages · Decks · Sheds · New buildings
Project example
A detached garage plan may require a thickened-edge slab, continuous frost footing, or engineered foundation depending on size, soil, climate, and local amendments.
Also called
Where this term shows up in permit work and how it affects the project
Foundation design determines excavation depth, reinforcement, anchoring, structural calculations, concrete inspections, and whether work can proceed before approval.
If this term appears in a form, plan comment, or local ordinance, start with the building permit guide, compare it against the zoning permit guide, then use the permit guide directory to find the right local path.
Why footing / foundation matters in a permit file
Footings spread building loads into soil, while the foundation transfers and supports the structure above. Permit documents must show a complete load path suited to local frost, soil, wind, geometry, and use—not merely label a line 'foundation.'
Where it appears in the permit process
Design basis
The designer establishes loads, soil assumptions, frost depth, bearing, foundation type, drainage, and the relationship to existing construction.
Structural review
Plans are checked for dimensions, depth, reinforcement, concrete or masonry, connections, anchors, slabs, and special engineering.
Excavation and form inspection
The AHJ may inspect soil, depth, width, reinforcement, forms, utilities, and setbacks before concrete is placed.
Foundation completion
Waterproofing, drainage, backfill, anchors, slab preparation, and as-built location may be verified before framing proceeds.
What you may need
- Foundation plan and dimensioned sections
- Design loads, frost depth, soil-bearing assumption, and material strengths
- Reinforcement, anchor, slab, drainage, and waterproofing details
- Geotechnical report or structural calculations when required
- Existing-foundation connection details for additions
Where to get it or verify it
- Use the AHJ's adopted code, climate criteria, local amendments, and standard foundation details.
- Use a structural engineer or geotechnical professional when spans, loads, soils, slopes, retaining conditions, or existing structures fall outside prescriptive design.
- Get proprietary anchor, form, and foundation-system documentation from the manufacturer.
Common mistakes that create comments or delays
- Submitting a floor plan without a matching foundation plan
- Using a generic detail that conflicts with local frost depth or the actual building
- Pouring concrete before the required inspection
- Changing building dimensions or post locations without updating the load path
What to do next
- Select a foundation approach that matches the building, site, and local criteria.
- Coordinate every wall, post, opening, anchor, and utility penetration.
- Obtain required engineering and approval before excavation.
- Schedule inspections before concrete, backfill, slab, and concealment.