Back to glossary
Building Permit Glossary

Easement

A limited right to use another's land for a specific purpose such as utilities, drainage, or access.

Site & zoningProperty records

Applies to

Accessory structures · Additions · Fences · Pools · Driveways · Utilities

Project example

A rear-yard garage may meet the zoning setback and still conflict with a utility easement that reserves the same strip for underground service access.

Also called

utility easementright of way

Where this term shows up in permit work and how it affects the project

An easement can restrict placement even when the zoning table appears to allow it. Approval from a building department does not erase the rights held by the easement beneficiary.

If this term appears in a form, plan comment, or local ordinance, start with the building permit guide, compare it against the zoning permit guide, then use the permit guide directory to find the right local path.

Why it matters for approval

Why easement matters in a permit file

An easement grants someone else a defined right over part of the property. The owner still owns the land, but construction in that area can interfere with access, drainage, utilities, or another recorded purpose.

Where it appears in the permit process

  1. Property due diligence

    Recorded documents, title work, surveys, subdivision plats, and utility records can identify easements before design begins.

  2. Site-plan review

    Reviewers often expect known easements to be drawn and labeled with the proposed structure outside them.

  3. Utility or engineering review

    A separate utility, drainage, public-works, or engineering office may need to review encroachments.

  4. Construction and enforcement

    The easement holder may need access later and can have rights that are independent of the permit decision.

What you may need

  • Current plat of survey and recorded subdivision plat
  • Title commitment, deed exceptions, or recorded easement document
  • Utility locate and service records when relevant
  • Site plan showing the easement width, purpose, and proposed work
  • Written encroachment or release decision when the holder offers one

Where to get it or verify it

  • Check closing documents, the county recorder or register of deeds, and a licensed surveyor.
  • Contact the named utility, drainage district, association, or other easement holder for its requirements.
  • Do not assume the municipal GIS displays every private or recorded easement.

Common mistakes that create comments or delays

  • Treating a blank GIS layer as proof that no easement exists
  • Assuming a fence or shed is allowed because it has no permanent foundation
  • Showing the easement on the survey but omitting it from the proposed site plan
  • Believing a building permit overrides the recorded property right

What to do next

  1. Identify every recorded and visible easement affecting the work area.
  2. Read the easement purpose and the rights it grants.
  3. Move the project outside the area or obtain the required written review before filing.
  4. Keep the source document with the permit record for future owners and field crews.

Read the practical guides

Related permit paths

Related permit terms

Apply the term

See what this means for a real project address.

Permitech connects permit language to the responsible office, project requirements, required documents, and filing sequence.