Permitech GOV: The Front Door

1 minute · Music, no narration

About the film

How a pre-submittal layer sits in front of the permitting system a department already runs.

A one-minute illustrated film for building departments, with music and on-screen text. Incomplete applications cost staff a round trip at intake and again at review. Permitech GOV is a pre-submittal layer on top of the system a department already runs: applicants fix the gaps first, so zoning, parcel and forms are checked before an application is filed, and staff still make every decision. The film closes with what two cities spend on permitting software and an example 90-day pilot whose figures are illustrative.

Length
1 minute
Sound
Music, no narration
Plays on
YouTube
  • The moving pipeline is an illustration. None of its traffic is data.
  • The checklist is an example from a Naperville shed permit (Municipal Code 6-2-10.1).
  • The pilot table is an illustrative example of what a pilot would measure. It is not a Permitech result or a forecast.

Transcript

Scene by scene

The film has music and no narration. Each scene is described below with its on-screen text.

  1. An illustrated pipeline runs from an applicant's house to intake at city hall, plan review and a decision stamp.

    Applications with gaps are turned away at intake as correction letters. Others pass intake and are sent back from review, and resubmittals pile up on the plan reviewer's desk.

    On screen

    Municipal permitting

    Applications arrive incomplete.

    Every round trip costs staff time.

  2. A Permitech GOV pre-submittal check lands between the applicant and city hall. Applications waiting at the door go back through it, and each one is checked before it reaches intake.

    On screen

    Permitech GOV

    A pre-submittal layer.

    On top of the system you already run.

  3. One application opens into a Filing Checklist, labeled as an example shed permit in the City of Naperville. A scan flags missing items, such as confirming 5 ft from the side and rear lot lines under Municipal Code 6-2-10.1. The applicant fixes them and the application reaches Ready to file while Permibot points to the rows.

    The application passes intake on its first try, and the reviewer is pleased to see complete applications arrive.

    On screen

    Applicants fix the gaps first.

    Zoning, parcel and forms checked before it's filed.

  4. The chain is labeled: applicant, then Permitech GOV before submittal, then the department's permitting system, staff review and decision, marked as the existing system, unchanged. Checked applications move through. One is still sent back by the reviewer.

    On screen

    Your staff still make every decision.

  5. Two cost cards. Denver's city boundary draws with a pin, then a civic building appears for Rockford, Illinois. The sources are listed under the cards and named as other vendors' contracts, not Permitech's.

    On screen

    What cities spend

    Permitting software isn't cheap.

    Denver, AI guided plan review: Up to $4.6M over five years

    Rockford, Ill., new permit software: $305K in year one, then $212K a year

  6. A short stack of applications travels a 90-day track whose last 30 days are marked Measure. A table labeled Example 90-day pilot shows first-round approval rate going from 36% to 71% and intake cycles per permit from 2.6 to 1.3.

    On screen

    How we start

    Start with a short list of permits for 90 days.

    At a fraction of that cost, scoped to your budget and your system.

  7. The check mark becomes part of the Permitech GOV logo: an orange layer with a check set on civic columns.

    On screen

    Pre-submittal layer for municipal permitting

    Start a pilot at permitech.io/government

    Example pilot figures are illustrative. We don't guarantee approval rates, timelines or code interpretations.